Saturday, June 22, 2019

A week in the life

I took pictures at the end of every day this week.
I went down to Menards on Monday and bought doors. Installed all the interior doors. Looking at this picture I see that the flooring was not under the range yet and the vanity was not in the bathroom.


But I had doors on the bedrooms


and the basement stairway

The exterior door was at least in the house.

So Monday was a productive day.
 Tuesday I laid the floor in the laundry area and the hallway
 Started putting trim around the doors and the windows
And more trim

 and more trim

and more trim

 and more trim
At the end of the day the app on my phone read 13,798 steps. I felt like I had walked that much.

 Wednesday the vanity went into the bathroom and it was time to start running plumbing.
Supply lines are under the kitchen sink.
 The house was vacant for a winter and all the pipes needed to be replaced.
 I wanted the water hooked up to the shower to make sure there were no leaks in the wall we were going to tile.
 I should have used red and blue pex lines. I was getting confused which was hot line and which was cold line after a while.
 When I went back to trace all the lines I had to cut and switch 2 lines because I had hooked a hot to the cold supply and vise versa.
 I still need to go through to cut out all the old cvpc lines and put clips on the new plumbing to hold it up.
New washer hookup lines but the drain still has to be cut through the floor. The floors in this house are 2 and 1/2 inch thick. I have never seen that before.

The water heater is full of water and does not leak but we do not have the gas turned on yet so I wonder if it will light.
 Of course in my extra time did some trim

and some more trim


 You might find this hard to believe but I put up more trim on Thursday.

Kitchen window is set back 6 inches from the interior wall so I had to put trim in the frame around the window .
Put all the trim between the kitchen and the laundry room. 

Put the closet in the one bedroom.

and the thresholds in the doorways 

 I cut them out of cedar wood.
Drove past a tenant house and saw they they had added a water feature.
It looks pretty cool. 

 Then I spent the rest of Thursday putting up trim
 and more trim
 and more trim

 Friday I spent most of my day brushing on polyurethane 
The cupboards have a pretty good finish but all the wood work needs to be done again.
Micah started tiling the shower on Friday and finished it on Saturday.
I put in the exterior door. It was a tight fit and I had to adjust it to make it open and close.
Then we laid the floor in the bathroom.
Then to finish off the day I put trim in the bathroom.
I haven't walked through the house to check yet but I sure hope I have the last of the trim up.
The house looks a lot different on the inside now than it did Monday morning. It was not 1 large project that changed the house but a lot of small projects day after day.
All too often we want to do something big in the kingdom of God and all God is asking us to do is to be faithful with the small jobs he asks us to do every day. 
Very few of us will be the evangelist that leads thousands of people to salvation, but all of us can be the person who shows God's love to our neighbor.
This week I did a lot of repetitious small jobs to change a house. I did some small things to help others also. What I am saying is sometimes when building God's kingdom it is the constant steady small tasks that make the changes. 









No comments:

Post a Comment